Here's the new one in progress. I know, not as cool as Kerry's RJ but here it is anyway. Also posting to rcgroups...
Fuse prep. CF installed in tail and push rod guide tube glued in for elevator.
Fuse reinforcement per instructions
Epoxied fuse halfs together. Used bags of water for weight
Tail feathers
Vstabs reinforced with CF
Hstab installed. Also reinforced with CF
Elevator installed. Make sure both sides are even
Vstabs installed. Making sure they are squared up
Used bamboo skewer to poke hole for longer reinforcement rod (CF)
Nacelles
Cut tabs
Place motor inside nacelle, epoxy halves together. I had to enlarge the wire hole on the nacelle for the motors. I am using BL motors...3 wires...
Airframe done and ready for electronics and paint
Hope to have it flight worthy by Sunday (weather permitting).
Marty